Management Services - Setting Out
Setting Out
Day to day duties that should be undertaken by our competent setting/site engineers in all aspects of temporary works with a detailed understanding of quality control and construction safety, having an extensive experience of RC frames with or without multi-storey basements, with an ability to work in a highly pressurised environment are as follow:
- Site setting out
- Establishing the station coordinates and levels
- Grid line setting out for the internal (party wall, internal walls, brick work, door opening, balustrade) setting out for the balcony and terrace, pots setting out and levelling
- Surveying
- Levelling
- Levels the deck, check the plump up for the stair; lift shaft
- Levelling for the up stand
- Setting out position drainage and falls
- As built Levels survey for the all floor finish
- Check the slab edge survey, service hole survey, column survey
- Order the concrete

Feel free to contact us and one of our representatives shall get back to you as soon as possible.